| Students | Jacob Michael LeBlanc
|
| School | HDSB - Abbey Park High School - Oakville |
| Level | Senior 11/12 - Grade 11 |
| Group | Group 2 - Engineering and Computing I |
| Abstract | The purpose of this project is to design and test a new multi-chamber catch basin that improves stormwater management and water quality in urban areas. By separating debris and water, the basin aims to reduce clogging, manage peak water flow and enhance pollutant removal. This design demonstrates an engineering solution that is efficient and sustainable. |